Defender leaderboard, 2019 World Championships

Every defending partnership at the Wuhan 2019 championship, ranked by the IMPs their defence gained versus the field in the identical contract on the same deal. Both partners share every board; the two right-hand columns split that IMP result by which partner made the opening lead. Use the slider to set a minimum board count.

Source Wuhan 2019 · round-robin + knockout · leave-one-out

comp bd = boards in this comparison / total defended; every column is averaged over the left number (boards where another table declared your exact contract at the matched seat). · held v DD double-dummy declarer tricks minus actual, positive = you held declarer below par. · tricks v field held declarer to fewer tricks than other defenders in the same contract. · set v field did you defeat it, minus the field's set-rate. · IMP v field that trick edge in IMPs from the defending seat, the ranking. The two on lead columns split that IMP figure by which partner made the opening lead; a big gap means one partner's leads land better. Green beats the field, red trails it. · peers = same contract at the same declarer seat by default, toggle to either seat of the side. · * = fewer than 60 boards. Click a column heading to sort, any country to highlight. Caveat: results can't fully separate great defence from declarer error, read vs the field.
Worked example, every board CORNELL / BACH defended (Open), all four columns

The pair defended 134 boards together; 124 had another table in the identical contract from the same declarer seat (the default matching). Every column, F1 included, is averaged over those 124 boards. Both partners share every board, the two on-lead columns then split F4 by who actually made the opening lead.

held v DD = DD decl tricks − actual  ·  tricks v field = mean(peer decl tricks) − actual  ·  set v field = set? − field set-rate  ·  IMP v field = IMP( your defenders' score − peers re-scored to the defending side of your contract )

The biggest single board, RR-r22 board 21, 6NT by the opponents (S), BACH on lead

Declarer took 11 (needs 12); double-dummy 12. 13 other tables were in 6NT, 8% defeated it, the pair set it.
F1 = 12 − 11 = +1 (declarer vs double-dummy)
F2 = 11.9 − 11 = +0.92 (held below the same-contract field)
F3 = set (1) − 0.08 = +0.92
F4 = IMP( your +100 − field −1322 ) = +15.69
Full ledger, all 134 defended boards
F1·DDF2·tricks vs fieldF3·defeating vs fieldF4·IMPs vs field
Boardcontractleddecl/DD=F1#prpeer trk=F2fld setresult=F3your $fld $=F4
RR-r1 b23NT SBACH10/11+11210.3+0.330%made+0.00−630−640+0.33
RR-r1 b51NT NCORNELL8/7−1107.1−0.900%made+0.00−120−93−0.9
RR-r1 b73Sx× SBACH7/7+027.5+0.50100%set+0.00+500+350+3.5
RR-r1 b92S NCORNELL8/8+058.0+0.000%made+0.00−110−110+0
RR-r1 b103NT SBACH11/11+0711.0+0.000%made+0.00−660−660+0
RR-r1 b113S NCORNELL9/9+0210.0+1.000%made+0.00−140−170+1
RR-r1 b122H SBACH8/7−1107.5−0.5050%made−0.50−110−5−2.5
RR-r1 b133NT SBACH12/13+11011.7−0.300%made+0.00−690−681−0.3
RR-r1 b143NT SBACH7/9+2127.8+0.7592%set+0.08+100+31+1.92
RR-r1 b152H NCORNELL9/8−158.4−0.600%made+0.00−140−122−0.6
RR-r1 b163NT SBACH8/8+00···set····
RR-r10 b196NT WCORNELL13/13+0113.0+0.000%made+0.00−1470−1470+0
RR-r10 b204S WCORNELL8/9+10···set····
RR-r10 b214S WCORNELL12/12+0311.7−0.330%made+0.00−480−470−0.33
RR-r10 b223S WCORNELL7/8+177.7+0.71100%set+0.00+200+129+2.14
RR-r10 b233NT EBACH8/10+259.8+1.800%set+1.00+100−624+12.2
RR-r10 b244H WCORNELL8/9+138.7+0.67100%set+0.00+100+67+1.33
RR-r10 b251Sx× EBACH4/3−114.0+0.00100%set+0.00+800+800+0
RR-r10 b264S EBACH10/10+01410.1+0.070%made+0.00−620−622+0.07
RR-r10 b283NT WCORNELL11/10−12210.3−0.680%made+0.00−460−440−0.68
RR-r10 b305Cx× EBACH8/8+00···set····
RR-r10 b314H EBACH8/9+118.0+0.00100%set+0.00+100+100+0
RR-r12 b217S NCORNELL13/13+01813.0+0.000%made+0.00−2210−2210+0
RR-r12 b233NT NCORNELL8/9+1239.5+1.524%set+0.96+100−587+11.52
RR-r12 b245Dx× NCORNELL7/7+00···set····
RR-r12 b272NT NCORNELL11/8−30···made····
RR-r12 b304S SBACH10/10+01910.0+0.000%made+0.00−420−420+0
RR-r13 b12H EBACH9/8−128.0−1.000%made+0.00−140−110−1
RR-r13 b33D WCORNELL6/8+219.0+3.000%set+1.00+300−110+9
RR-r13 b45D WCORNELL11/13+21211.3+0.3317%made−0.17−600−487−1.5
RR-r13 b62S WCORNELL7/7+067.0+0.00100%set+0.00+100+100+0
RR-r13 b72H EBACH8/9+168.7+0.670%made+0.00−110−130+0.67
RR-r13 b84S EBACH11/11+01611.1+0.130%made+0.00−450−454+0.13
RR-r13 b95Dx× EBACH10/9−119.0−1.00100%set+0.00+200+500−7
RR-r13 b113NT EBACH6/6+027.5+1.5050%set+0.50+150−125+5.5
RR-r13 b132S WCORNELL8/8+038.0+0.000%made+0.00−110−110+0
RR-r14 b174H WCORNELL9/7−20···set····
RR-r14 b186C EBACH11/11+0911.0+0.00100%set+0.00+50+50+0
RR-r14 b224H WCORNELL9/10+1109.5+0.5060%set+0.40+100−191+4.9
RR-r14 b233NT WCORNELL9/9+0108.9−0.1020%made−0.20−600−456−2.3
RR-r14 b243NT WCORNELL8/9+1118.4+0.3645%set+0.55+50−186+5.09
RR-r14 b273C WCORNELL9/9+019.0+0.000%made+0.00−110−110+0
RR-r14 b314H WCORNELL10/10+0910.3+0.3311%made−0.11−420−381−0.67
RR-r15 b11NT EBACH7/8+118.0+1.000%made+0.00−90−120+1
RR-r15 b56S WCORNELL12/12+02012.1+0.050%made+0.00−980−981+0.05
RR-r15 b133NT WCORNELL8/9+1138.6+0.6231%set+0.69+100−372+7.85
RR-r15 b143NT EBACH7/7+0138.4+1.3854%set+0.46+100−145+5.08
RR-r15 b164S WCORNELL9/8−158.8−0.20100%set+0.00+100+120−0.6
RR-r16 b185C WCORNELL10/10+0119.7−0.27100%set+0.00+50+64−0.55
RR-r16 b193NT WCORNELL9/10+1110.0+1.000%made+0.00−600−630+1
RR-r16 b246S EBACH12/12+01712.0+0.000%made+0.00−980−980+0
RR-r16 b263C EBACH8/7−118.0+0.00100%set+0.00+100+100+0
RR-r18 b213H NCORNELL9/8−168.0−1.0067%made−0.67−140+53−4.67
RR-r18 b224S SBACH9/9+059.0+0.00100%set+0.00+50+50+0
RR-r18 b243NT SBACH11/9−2510.8−0.200%made+0.00−460−454−0.2
RR-r18 b251NT SBACH6/6+016.0+0.00100%set+0.00+50+50+0
RR-r18 b264H SBACH6/9+339.0+3.00100%set+0.00+400+100+7
RR-r18 b274H NCORNELL11/11+0910.8−0.220%made+0.00−450−443−0.22
RR-r19 b22S EBACH7/7+077.1+0.1486%set+0.14+50+27+0.57
RR-r19 b33NT WCORNELL12/13+11312.3+0.310%made+0.00−690−699+0.31
RR-r19 b53NT EBACH10/10+02110.1+0.100%made+0.00−430−433+0.1
RR-r19 b83NT WCORNELL8/8+0108.1+0.1090%set+0.10+50+5+1
RR-r19 b93D WCORNELL9/10+149.3+0.250%made+0.00−110−115+0.25
RR-r19 b103H WCORNELL8/9+119.0+1.000%set+1.00+100−140+6
RR-r19 b114S WCORNELL10/10+0610.2+0.170%made+0.00−420−425+0.17
RR-r19 b124Sx× EBACH9/8−159.0+0.00100%set+0.00+100+100+0
RR-r19 b145D EBACH12/13+1411.8−0.250%made+0.00−420−415−0.25
RR-r19 b152NT WCORNELL6/7+129.0+3.000%set+1.00+100−150+6
RR-r19 b161S WCORNELL7/8+118.0+1.000%made+0.00−80−110+1
RR-r2 b192Sx× WCORNELL5/6+136.0+1.00100%set+0.00+800+500+6.33
RR-r2 b314Cx× EBACH10/9−119.0−1.00100%made−1.00−510+100−12
RR-r2 b321NT WCORNELL7/7+0137.0+0.000%made+0.00−90−90+0
RR-r20 b175Cx× NCORNELL8/8+038.0+0.00100%set+0.00+500+500+0
RR-r20 b194Hx× SBACH10/10+099.9−0.1111%made−0.11−590−513−1.33
RR-r20 b203NT SBACH7/9+2218.9+1.9538%set+0.62+200−337+8.9
RR-r20 b224H SBACH11/11+01110.9−0.090%made+0.00−450−447−0.09
RR-r20 b234S SBACH9/10+149.5+0.5050%set+0.50+100−260+6
RR-r20 b252S SBACH11/10−159.2−1.800%made+0.00−200−146−1.8
RR-r20 b322S NCORNELL10/9−119.0−1.000%made+0.00−170−140−1
RR-r21 b23NT SBACH12/11−1910.4−1.560%made+0.00−690−643−1.56
RR-r21 b66S NCORNELL12/12+0312.0+0.000%made+0.00−980−980+0
RR-r21 b91NT NCORNELL4/6+2127.0+3.0025%set+0.75+150−61+5.5
RR-r21 b123NT NCORNELL9/8−119.0+0.000%made+0.00−600−600+0
RR-r21 b134D SBACH8/9+159.0+1.00100%set+0.00+200+100+3
RR-r22 b183NT SBACH8/8+0128.3+0.3358%set+0.42+100−183+4.75
RR-r22 b194H NCORNELL10/10+0179.6−0.4141%made−0.41−420−226−4.12
RR-r22 b216NT SBACH11/12+11311.9+0.928%set+0.92+100−1322+15.69
RR-r22 b224H NCORNELL10/10+0111.0+1.000%made+0.00−420−450+1
RR-r22 b263D SBACH8/7−10···set····
RR-r22 b273NT NCORNELL10/9−1169.2−0.816%made−0.06−430−379−1.31
RR-r22 b313NT SBACH5/9+428.0+3.0050%set+0.50+400−200+9.5
RR-r22 b324H NCORNELL10/10+02210.1+0.050%made+0.00−420−421+0.05
RR-r23 b11NT NCORNELL8/7−157.8−0.200%made+0.00−120−114−0.2
RR-r23 b33NT SBACH6/7+10···set····
RR-r23 b53NT SBACH9/9+0168.4−0.5644%made−0.44−600−277−5.38
RR-r23 b66S SBACH13/13+01712.7−0.350%made+0.00−1010−999−0.35
RR-r23 b105Cx× NCORNELL10/10+039.7−0.33100%set+0.00+200+300−2.33
RR-r23 b111NT SBACH8/8+00···made····
RR-r23 b124S SBACH11/11+01611.6+0.560%made+0.00−650−667+0.56
RR-r23 b134Sx× NCORNELL9/8−168.5−0.50100%set+0.00+200+350−3.17
RR-r23 b152S NCORNELL8/7−1118.4+0.369%made−0.09−110−105+0
RR-r4 b184Sx× WCORNELL9/9+089.3+0.2588%set+0.12+100+1+1.63
RR-r4 b211NT WCORNELL10/10+0110.0+0.000%made+0.00−180−180+0
RR-r4 b234H EBACH12/12+01710.8−1.240%made+0.00−680−643−1.24
RR-r4 b243NT WCORNELL9/9+059.6+0.600%made+0.00−400−418+0.6
RR-r4 b254S EBACH12/11−1110.0−2.000%made+0.00−680−620−2
RR-r4 b261H EBACH9/8−138.7−0.330%made+0.00−140−130−0.33
RR-r4 b273S EBACH9/8−188.6−0.3738%made−0.38−140−69−1.88
RR-r4 b283NT EBACH9/8−188.9−0.1225%made−0.25−400−291−2.38
RR-r4 b294S EBACH10/10+089.9−0.1213%made−0.13−620−530−1.5
RR-r4 b306C WCORNELL12/12+0112.0+0.000%made+0.00−920−920+0
RR-r4 b314H EBACH11/11+01111.0+0.000%made+0.00−450−450+0
RR-r6 b183NT NCORNELL9/9+049.3+0.250%made+0.00−600−607+0.25
RR-r6 b193NT NCORNELL10/8−219.0−1.000%made+0.00−430−400−1
RR-r6 b215D NCORNELL10/10+01510.1+0.1393%set+0.07+100+52+0.8
RR-r6 b224S NCORNELL8/8+0188.7+0.67100%set+0.00+100+67+1.33
RR-r6 b252S SBACH9/9+00···made····
RR-r6 b273C NCORNELL10/9−128.5−1.5050%made−0.50−130−30−3
RR-r6 b294H SBACH10/9−1219.6−0.3838%made−0.38−620−346−4.57
RR-r6 b323NT NCORNELL11/8−31510.9−0.1327%made−0.27−460−344−2.27
RR-r7 b34S EBACH10/11+1710.1+0.140%made+0.00−620−624+0.14
RR-r7 b53S WCORNELL7/8+177.7+0.71100%set+0.00+100+64+1.43
RR-r7 b73H WCORNELL9/9+079.0+0.000%made+0.00−140−140+0
RR-r7 b82H WCORNELL6/7+157.6+1.6040%set+0.60+100−46+3.8
RR-r7 b113NT WCORNELL7/8+1117.7+0.7382%set+0.18+100−7+2.64
RR-r7 b154S WCORNELL10/11+11610.3+0.250%made+0.00−420−427+0.25
RR-r8 b173NT SBACH7/8+1127.7+0.6767%set+0.33+100−65+3.67
RR-r8 b225D SBACH11/11+0911.0+0.000%made+0.00−400−400+0
RR-r8 b243NT SBACH12/11−1611.3−0.670%made+0.00−490−470−0.67
RR-r8 b253NT NCORNELL9/9+0310.0+1.000%made+0.00−400−430+1
RR-r8 b263C SBACH6/5−136.7+0.67100%set+0.00+300+233+2
RR-r8 b272H SBACH8/8+078.1+0.140%made+0.00−110−114+0.14
RR-r8 b284S SBACH10/10+0310.3+0.330%made+0.00−620−630+0.33
RR-r8 b316NT SBACH12/12+02012.3+0.250%made+0.00−1440−1447+0.25
Reconciliation, matches the CORNELL / BACH row in the Open table.
F1 Σ+12 ÷ 124 = +0.10 · F2 Σ25.2 ÷ 124 = +0.20 · F3 +0.06 · F4 Σ+98.47000000000003 ÷ 124 = +0.79
on lead: BACH +0.76 (n 59) · CORNELL +0.83 (n 65)
min boards 35 boards